CHARACTERISTICS ANALYSIS FOR HIGH-RISE BUILDINGS DURING TOP-DOWN CONSTRUCTION
Author:
Wang Yuanhang1, Pan Xiaoying2, Xu Hui1, Liu Jinyang2, Li Peizhen2, He Lingbo1, Zhang Wenxin1
Affiliation:
1. The First Construction Co., Ltd of China Construction Third Engineering Bureau Group, Wuhan, 430040, China 2. State Key Laboratory of Disaster Reduction in Civil Engineering, Tongji University, Shanghai, 200092, China
Abstract
New advances in top-down construction are developing with the construction of supertall buildings in China. This study presents a finite element analysis for high-rise structural construction with a top-down method (TDM) considering complex environmental conditions. Based on this analysis model, the forces and the deformation of the diaphragm wall, beams, and soldier piles at various stages of construction are computed. Taking a super high-rise building with a 5-story basement in Nanjing as an example, the reliability and accuracy of the model is verified by comparing the measured and simulated results of displacement and stress values at various locations. The research results reveal the relationship between excavation depth, soil settlement and pile displacement, which is convenient for finding the optimal construction critical surface. It lays a foundation for the study of the critical height of the subsequent construction and facilitates the prediction of the weak link in the process. At present, this project is under construction, so this study has reference value for subsequent construction projects.
Publisher
Vilnius Gediminas Technical University
Reference24 articles.
1. Cai, S.-H. (2003). Modern steel tube confined concrete structure. China Communications Press. 2. Han, J., Wang, J., Jia, D., Yan, F., Zhao, Y., Bai, X., Yan, N., Yang, G., & Liu, D. (2023). Construction technologies and mechanical effects of the pipe-jacking crossing anchor-cable group in soft stratum. Frontiers in Earth Science, 10. https://doi.org/10.3389/feart.2022.1019801 3. Jiangsu Nanjing Geo-Engineering Surveyiec Institute. (2014). The detailed investigation report of geotechnical engineering of Nanjing International Square Phase II (Report No. 2014-GK001). Nanjing International Group Co., LTD (in Chinese). 4. Li, T., Zhao, W., Liu, R., Han, J., Jia, P., & Chen, C. (2022). Visualized direct shear test of the interface between gravelly sand and concrete pipe. Canadian Geotechnical Journal. https://doi.org/10.1139/cgj-2022-0007 5. Liu, Y., Li, J.-P., & Chen, W. (2013). Key construction techniques for oversized excavation pits using top-down method. Chinese Journal of Geotechnical Engineering, 35(1), 489-494 (in Chinese).
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
|
|