CONCESSION PERIOD DETERMINATION FOR PPP RETIREMENT VILLAGE

Author:

Liu Shijing1,Jin Hongyu1,Xie Benzheng2,Liu Chunlu1,Mills Anthony1

Affiliation:

1. Deakin University

2. Shandong Jianzhu University

Abstract

Demand for the construction of retirement villages is increasing with the worldwide growth in ageing populations. However, the development of retirement villages can be impeded by many factors, such as limited available land and high investment costs. Public–private partnership (PPP) as an alternative financing mechanism has been widely applied in the construction of public infrastructure projects and may provide new funding sources for building retirement villages. By applying PPP to the construction of retirement villages, the independent living requirements of seniors can be met and the financial difficulty of the construction of retirement villages can be resolved. Similar to other PPP projects, when retirement villages are constructed under a PPP process, the concession period is a key decision variable in relation to the success of the project. The concession period is stated in the project contract between the government and private investors, and stipulates the date when the project ownership and operation are transferred from the private investor back to the government. The government should take detailed information into consideration at the initial project stage when determining the concession period. This paper proposes PPP as a new procurement method to be applied to the construction of rental retirement villages and develops a concession period determination process for PPP retirement village projects with consideration of real options, focusing on the option to defer. An empirical example with alternative scales, which is developed from an existing retirement village in Geelong, Australia, is used to numerically verify the process and the impacts of key variables on the concession period. The determination process provides an alternative tool for governments to design the concession period before the tendering stage and will benefit the development of industries associated with services for the ageing population. This process can also be applied to the construction of other financially non-viable PPP projects such as social housing.

Publisher

Vilnius Gediminas Technical University

Subject

Strategy and Management

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3