Impact of organizational factors on delays in BIM-based coordination from a decision-making view: a case study

Author:

JANG Sejun1ORCID,LEE Ghang2ORCID

Affiliation:

1. Hyundai Engineering and Construction

2. Yonsei University

Abstract

This study analyzed the impact of organizational factors on delays in building information modeling (BIM)- based coordination for mechanical, electrical, and plumbing (MEP) systems from the decision-making perspective. Recently BIM-based coordination has been regarded as a critical phase in project delivery but suffers from delays during the coordination process. This study investigated three complexity factors that often contribute to coordination delays: the number of participants – the total number of participants involved in a decision-making process for resolving a coordination issue; the level of the decision makers – the highest decision-maker involved in a problem-resolution process; and the heterogeneity of participants –the number of trades related to an issue. Using 95 major coordination issues derived from 11,808 clashes in a case study, the correlations between the coordination time and the complexity factors were analyzed. The coordination time linearly increased as each factor increased. The number of participants had the highest correlation with the coordination time, followed by the level of decision makers and the heterogeneity of participants. The findings stress the significance of integration between BIM and lean approaches, such as Obeya (big room) and Shojinka (flexible manpower line), during BIM-based coordination to expedite decision-making processes and eventually to reduce the coordination time.

Publisher

Vilnius Gediminas Technical University

Subject

Strategy and Management,Civil and Structural Engineering

Reference47 articles.

1. AIA. 2011. IPD case studies. AIA Minnesota, and School of Architecture University of Minnesota, Washington D.C.

2. AIA. 2012. IPD case studies. AIA Minnesota, and School of Architecture University of Minnesota, Washington D.C.

3. Using social network theory and simulation to compare traditional versus BIM–lean practice for design error management

4. COMPLEXITY AND CLEAVAGE: DUAL EXPLANATIONS OF STRATEGIC DECISION-MAKING [I]

5. BCA. 2013. Singapore BIM guide version 2.0.

Cited by 12 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3