AN INTEGRATED FRAMEWORK FOR REDUCING PRECAST FABRICATION INVENTORY

Author:

Ko Chien-Ho1

Affiliation:

1. Department of Civil Engineering, National Pingtung University of Science and Technology, 1, Shuefu Rd., Neipu, Pingtung 91201, Taiwan

Abstract

Precast fabricators strive for business success on delivering products on time. To achieve this goal, fabricators start fabrication once they receive design information. However, this practice results in finished goods inventory which is regarded as waste. The objective of this study is to develop a framework for precast fabricators to reduce the inventory. The framework consists of three components. The first time buffer evaluation is used to avoid fabricators losing capacity by considering demand variability. The second component, due date adjustment, shifts production curve closer to erection dates to reduce inventory. The third scheduling component arranges production sequences to achieve multi-objectives using genetic algorithms. One real case is experimented to demonstrate the effectiveness of the proposed framework. The application results show that the developed framework can reduce the level of finished goods inventory without changing production resources. Santrauka Surenkamosios statybos sektorius siekia didinti verslo struktūru gebejima produktus tiekti laiku. Tokia gamyba pradedama vos gavus projektine informacija. Tačiau taip gaminant susikaupia daug gaminiu atsargu, apsunkinančiu imones veikla. Šio tyrimo tikslas ‐ sukurti sistema, kuri leistu tokias atsargas sumažinti. Sistema sudaro trys komponentai. Pirmasis komponentas padeda atsižvelgti i paklausos kitima ir išvengti per didelio gamybos pajegumu mažinimo. Šis komponentas vadinamas pirmojo pareikalavimo itakos sušvelninimu. Antrasis komponentas leidžia mažinti gamybines atsargas, gamyba priderinant prie statybos ir montavimo laiko. Trečiasis sistemos komponentas skirtas planuoti darbus, išdestant gamybos operaciju sekas pagal daugiatikslius kriterijus ir taikant genetinius algoritmus. Aprašomas praktinis pavyzdys, iliustruojantis pasiūlytosios sistemos efektyvuma. Taikymo rezultatai rodo, kad igyvendinta sistema leis sumažinti pagamintos produkcijos atsargas, nemažinant gamybos sanaudu.

Publisher

Vilnius Gediminas Technical University

Subject

Strategy and Management,Civil and Structural Engineering

Reference40 articles.

1. Incorporating fuzzy approaches for production planning in complex industrial environments: the roll shop case

2. Ballard, G. and Arbulu, R. Taking prefabrication lean. Proceedings of the 12th annual conference of the International Group for Lean Construction. Elsinore, Denmark. pp.629–642.

3. Flowshop scheduling model for bespoke precast concrete production planning

4. Example of a Hybrid Life-Cycle Assessment of Construction Processes

Cited by 27 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3