THE USE OF EXPLORATORY TUNNELS AS A TOOL FOR SCHEDULING AND COST ESTIMATION

Author:

Abdallah Ahmed1

Affiliation:

1. Dissertation Supervisor for British Columbia Institute of Technology (BCIT) , 904 ‐ 390 Burwell St., London, Ontario, N6B 0A1, Canada; Construction Management Program in conjunction , University of Bath , UK

Abstract

Exploratory tunnels are commonly used for examining the geotechnical and structural aspects of proposed tunnel alignments. This paper explores the utilisation of exploratory tunnels as a project management tool for estimating the cost and duration of construction for the entire project. Data were collected from the Kaponig 2,75 kilometers exploratory tunnel, a part of a double‐track high‐speed railway development in Austria. This knowledge and experience was used to evaluate the risks associated with design details for the final tunnel enlargement (alignment and grade, support requirements and excavation methods). A deterministic model based on Monte Carlo simulation was developed capable of predicting potential outcomes of the total project in terms of cost, duration and their associated probabilities.

Publisher

Vilnius Gediminas Technical University

Subject

Finance

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Improving merger and acquisition decision-making using fuzzy logic and simulation;International Journal of Engineering Business Management;2017-01-01

2. A PARETO MULTI-OBJECTIVE OPTIMIZATION APPROACH FOR SOLVING TIME-COST-QUALITY TRADEOFF PROBLEMS;Technological and Economic Development of Economy;2011-03-17

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3