Abstract
Energy demand has been increasing, but traditional sources of energy are depletable. New investments are needed in renewable energy production. Hydroelectric power plants are often considered a feasible renewable source of energy and are often organized as a public private partnerships (PPP). However, risk factors stemming from the macro environment as well as project conditions should be considered in performing feasibility studies. The objective of this study was to develop a method that can be used to predict the profitability of hydropower investments considering the relevant risk factors. To that end, a cash flow that represents the construction and operation period is set up, the risk factors involved in such projects are identified, the impacts of these risk factors on the cash flow parameters are assessed, and Monte Carlo simulation is performed to estimate the net present value (NPV) of a hydropower investment. The proposed method was tested in a hydropower investment located in Turkey and generated credible results that could be of great benefit to potential investors operating in similar conditions. The primary contribution of this research is the creation of a method that allows investors to assess the profitability of a hydropower investment by using a stochastic approach.
Publisher
Vilnius Gediminas Technical University
Subject
Strategy and Management,Civil and Structural Engineering
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献