Publisher
Afyon Kocatepe Universitesi Fen Ve Muhendislik Bilimleri Dergisi
Reference40 articles.
1. Atlı, Ö. and Kahraman, C. 2013. Fuzzy critical path analysis, Sigma Journal of Engineering and Natural Science, 31, 128-140.
2. Atli, Ö. 2011. Tabu search and an exact algorithm for the solutions of resource-constrained project scheduling problems.International Journal of Computational Intelligence Systems, 2, 255-267.
https://doi.org/10.1080/18756891.2011.9727781
3. Arauj, J.S.S., Santos, H.G., Gendron, B., Dominik J.S., Brito, S.S. and Souza, D.S., 2020. Strong bounds for resource constrained project scheduling: Preprocessing and cutting planes. Computers and Operations Research, 113, 104782.
https://doi.org/10.1016/j.cor.2019.104782
4. Birjandi A. and Mousavi S.M., 2019. Fuzzy resource-constrained project scheduling with multiple routes: A heuristic solution. Automation in Construction, 100, 84–102.
https://doi.org/10.1016/j.autcon.2018.11.029
5. Bouleimen, K. and Lecocq, H. A new efficient simulated annealing algorithm for the resource constrained project scheduling problem. Tech. rep., Service de Robotique et Automatisation, Universite de Liege, 1998.