1. EURISOL design study, available at www.eurisol.org
2. T. Stora, The EURISOL facility: feasibility study for the 100 kW direct targets, EURISOL internal task note 03-25-2006-0005 (2006).
3. T. Stora, Baseline parameters 05/2005, EURISOL internal task note 03-25-2006-0002 (2006)
4. N. Thiollière, Optimization of $^{6}\mathrm{He}$ production using W or Ta converter surrounded by BeO target assembly, CEA Saclay internal report DAPNIA-06-274 for EURISOL-DS Task 3 (2006)
5. D.B. Pelowitz (Editor), MCNPX user's manual version 2.5.0, LA-CP-05-0369 (2005)