Abstract
The paper deals with geodetic measurements of mutual longitudinal displacements ofconstruction of the railway bridge and rails on the bridge in Klášterec nad Oh í.Construction of the bridge is made of steel with a concrete deck, which carries the stonesuperstructure and rails. The bridge is about 100 meters long and expected deformationsare in millimetres. The method of geodetic network with the expected standard deviationsof coordinates about 0.2 mm was chosen. The deformation of the structure was determinedto be 4 mm, the deformation of the rails was determined to be 1 mm, both as a result ofepoch comparison.