1. [1] Ahmed, M.A., ve Alkhamis, T.M., (2009), “Simulation Optimization For An Emergency Department Healthcare Unit İn Kuwait”, European Journal Of Operational Research, 198, 936-942.
2. [2] Ambler, S. (2010). The Agile Maturity Model (AMM). 2014, from http://www.drdobbs.com/architecture-and-design/the-agile-maturity-modelamm/224201005
3. [3] Ambler, S. W., & Lines, M. (2012). Disciplined Agile Delivery: A Practitioner's Guide to Agile Software Delivery in the Enterprise: IBM Press.
4. [4] Anderson, D. J. (2003). Agile management for software engineering: Applying the theory of constraints for business results: Prentice Hall Professional. Banerjee, U. (2011).
5. [5] Azanha, A., Argoud, A.R.T.T., Camargo Junior, J.B.d. and Antoniolli, P.D. (2017), "Agile project management with Scrum: A case study of a Brazilian pharmaceutical company IT project", International Journal of Managing Projects in Business, Vol. 10 No. 1, pp. 121-142. https://doi.org/10.1108/IJMPB-06-2016-0054