Formation of development programs with multi-purpose projects at ferrous metallurgy enterprises

Author:

Zimin A. V.1,Burkova I. V.2,Zimin V. V.1

Affiliation:

1. Siberian State Industrial University

2. V.A. Trapeznikov Institute of Control Sciences, Russian Academy of Sciences

Abstract

The improvement of management mechanisms for the formation and calendar planning of development programs is the most important direction for improving the productivity (achievement of goals) and efficiency (reduction of the amount of resources consumed) of the activities of metallurgical companies. Currently, it is necessary to ensure the mobilization of companies’ assets to solve the tasks of their sustainable development. The task of forming a program for the development of a metallurgical enterprise (company) is considered. The program includes several different areas of development: improvement of existing business processes (sales, supply, production, repair of equipment, etc.), production technologies of various stages (production of coke, agglomerate, cast iron, steel, rolled products), implementation of digital transformation tasks, etc. Each of the directions of the development program contains projects described by effect, size of investments, changes in the expenditure items of operating budget related to the costs of operating those systems and processes that the project is aimed at improving, as well as an indicator describing the risk of project implementation. One of the directions of the development program may include multi-purpose projects, the implementation of which leads not only to changes in its own performance indicators, but also to changes in the performance indicators of projects of other (non-multi-purpose) directions of such development program. The case is considered when management of the development program includes the management of the overall budget and achievement of overall goal of the program (the maximum effect from implementation of all projects). At the same time, project risk management and changes in the operating budget are implemented at the level of project portfolio management of individual program areas (there are no restrictions on risks and changes in the operating budget common to the development program). The stated formalizations of the problems, their decomposition and composition schemes, and the developed procedures for solving individual subtasks are based on the provisions and methods of the theories of system analysis and a new section of discrete mathematics (network programming).

Publisher

National University of Science and Technology MISiS

Subject

Metals and Alloys

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3