1. Liu Z., Zhang J., Zuo H.-B., Yang T.-j. Recent progress on long service life design of Chinese blast furnace hearth. ISIJ International. 2012;52(10):1713–1723. https://doi.org/10.2355/isijinternational.52.1713
2. Analysis of metal receiver operation in order to increase the duration of blast furnace campaign and its safe operation. Novosti chernoi metallurgii za rubezhom. 2003;(4):32–36. (In Russ.).
3. Ruther P., Peters M. Requirements for a campaign life of more than 20 years at the blast furnace 2 of Thyssen Krupp Steel Europe. Chernye metally. 2015;(10):59–66. (In Russ.).
4. Bol’shakov V.I., Ivancha N.G., Nesterov A.S., etc. Development of measures to extend the blast furnace campaign by improving loading technology, slag mode and automated control of blast furnace parameters in conditions of unstable quality of charge materials. In: Proceedings of the Institute of Electric Welding named after E.O. Paton. Problems of Service Life and Operational Safety of Structures, Structures and Machines. Dnepropetrovsk: Z.I. Nekrasov Institute of Ferrous Metallurgy, National Academy of Sciences of Ukraine; 2015:628–634.
5. Mozharenko N.M., Kanaev V.V., Panchokha G.V. Influence of smelting technology on lining of metal receiver of blast furnaces. Metallurgicheskaya i gornorudnaya promyshlennost’. 2003;(5):5–8. (In Russ.).