1. Toshkodirova R., Abdurakhmonov S. Clinker processing — zinc industrial waste. Universum: technicheskie nauki. 2020. No. 11 (80). URL: https://7universum.com/ru/tech/archive/item/10966 (accessed: 20.10.2021) (In Russ.).
2. What did you write about the opening of the Belovsky zinc plant? URL: https://vestnik-belovo.ru/vopros/48138/chto-pisali-ob-otkrytii-belovskogo-tsinkovogo-zavoda/ (accessed: 15.10.2021) (In Russ.).
3. Gas′kova O.L., Bortnikova S.B., Kabannik V.G., Novikova S.P. Features of soil pollution in the area of waste storage of pyrometallurgical zinc extraction at the Belovsky zinc plant. Khimiya v interesakh ustoichivogo razvitiya. 2012. Vol. 20. No. 4. Р. 419—428 (In Russ.).
4. Kasimov A.M., Leonova OV, Ivanov S.Ya. Valuable metals and industrial waste II. Tsvetnaya metallurgiya. 2007. No. 7. Р. 36—38 (In Russ.).
5. Haritidi G.S., Skopov G.V., Kolmachikhin V.N. Low-waste technology of clinker processing of zinc plants at the Ural copper-smelting enterprises. Tsvetnye metally. 1991. No. 4. Р. 5—7 (In Russ.).