Author:
Wang C.,Yang B.,Wang H. Q.
Abstract
Focusing on the balanced use of production capacity in the formulation of master production schedule (MPS), this paper sets up a single-product, multi-stage, multi-objective MPS model based on balanced production. Whereas the model aims to achieve multiple objectives through nonlinear integer programming, a genetic algorithm based on automatic transformation (AT-GA) was designed to solve the model. Specifically, the chromosomes were encoded as integers to satisfy the model constraints; the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) was adopted to handle the four nonlinear objectives of the model, thereby obtaining the fitness function; the fuzzy logic control (FLC) was introduced to automatically adjust the crossover and mutation parameters, and balance the global and local search abilities of the GA, enhancing the computing power of the algorithm. The experimental results show that the AT-GA can effectively solve the multi-objective MPS optimization problem under balanced production.
Subject
Computer Science Applications,Modelling and Simulation
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献