1. 81 Rachid, Z., Toufik, B., & Mohammed, B. (2019). Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), 371-381. https://doi.org/10.1080/15623599.2018.1435234.
2. 82 Rasika Kanjana, & Phaithoon Kongsomboon. (2018). Problems of modifying construction contracts based on the changed circumstances principle. Thammasat University Law Journal, 2018(1), 528-538.
3. 83 Samarghandi, H., Mousavi, S., Taabayan, P., Mir Hashemi, A., & Willoughby, K. (2016). Studying the Reasons for Delay and Cost Overrun in Construction Projects: The Case of Iran. 51-84. https://doi.org/10.21315/jcdc2016.21.1.4.
4. Causes and effects of delays in Malaysian construction industry;Sambasivan;International Journal of project management,2007
5. Causes of delay in the global construction industry: a meta analytical review;Sanni-Anibire;International Journal of Construction Management,2022