Abstract
Background: Construction development in Indonesia is growing rapidly, especially in Central Aceh District. Construction projects often experience risks, so that risk events can have a serious impact on the viability of the project. Project delays can result in cost overruns and project losses. Therefore, it is necessary to identify the factors causing project delays.The purpose of this study was to (1) identify the risk factors that cause delays in construction projects and (2) determine those particular risk factors that have a greater influence on construction projects. The location of this research was Central Aceh District. Methods: The data in this study were primary data in the form of a questionnaire and secondary data obtained from the literature related to this particular type of research. Questionnaires were distributed to respondents, namely contractor companies located in the Central Aceh District. The questionnaires were distributed to determine respondents' opinions about the level of influence of risk factors causing project delays. We used a validity test, reliability test, and descriptive analysis for data processing. Results: Based on the results of the study from 47 respondents, the “very high influence” category (Mode=5) for the tool malfunction factor, cost estimation inaccuracy, increased work costs, implementation of new technologies, details, accuracy and conformity to specifications that are not appropriate, worker quarrels, poor project planning and management, poor condition at locations and accessibility difficulty. Conclusions: Of the 80 risk factors that caused project delays, eight risk factors were found to have a very high influence on the implementation of construction projects in Central Aceh District. Practical implications: The results of this study provide knowledge to contractor companies about the delay factors that have the most influence on project implementation so that they are expected to be able to manage risks to avoid losses.
Subject
General Pharmacology, Toxicology and Pharmaceutics,General Immunology and Microbiology,General Biochemistry, Genetics and Molecular Biology,General Medicine
Reference62 articles.
1. Community Leader of Central Aceh Regency: If the Multiyear Project Is Canceled, We Can Ask for Separation.;F Syam;Aceh Journal National Network.,2020
2. Project Complexity and Risk Management (ProCRiM): Towards modelling project complexity driven risk paths in construction projects.;A Qazi;Int. J. Proj. Manag.,2016
3. The effect of the risk factors on the performance of contractors in Banda Aceh, indonesia.;A Rauzana;ARPN J. Eng. Appl. Sci.,2016
4. Causes of delay in Saudi public construction projects.;J Alsuliman;Alex. Eng. J.,2019
5. Exploring delay causes of road construction projects in Egypt.;R Aziz;Alex. Eng. J.,2016