Critical delay factors for construction projects in Central Aceh District, Indonesia

Author:

Rauzana AnitaORCID,Zahrah Aghnia,Dharma Wira

Abstract

Background: Construction development in Indonesia is growing rapidly, especially in Central Aceh District. Construction projects have distinctive characteristics and are very complex, so that risk events can have a serious impact on the viability of the project. Project delays can result in cost overruns and project losses. Therefore, it is necessary to identify the factors causing project delays.The purpose of this study was to (1) identify the risk factors that cause delays in construction projects and (2) determine those particular risk factors that have a greater influence on construction projects. The location of this research was Central Aceh District. Methods: The data in this study were primary data in the form of a questionnaire and secondary data obtained from the literature related to this particular type of research. Questionnaires were distributed to respondents, namely contractor companies located in the Central Aceh District. The questionnaires were distributed to determine respondents' opinions about the level of influence of risk factors causing project delays. We used a validity test, reliability test, and descriptive analysis for data processing. Results: Based on the results of the study from 47 respondents, the “very high influence” category (Mode=5) for the tool malfunction factor, cost estimation inaccuracy, increased work costs, implementation of new technologies, details, accuracy and conformity to specifications that are not appropriate, worker quarrels, poor project planning and management, poor condition at locations and accessibility difficulty. Conclusions: Of the 80 risk factors that caused project delays, eight risk factors were found to have a very high influence on the implementation of construction projects in Central Aceh District. Practical implications: The results of this study provide knowledge to contractor companies about the delay factors that have the most influence on project implementation so that they are expected to be able to manage risks to avoid losses.

Publisher

F1000 Research Ltd

Subject

General Pharmacology, Toxicology and Pharmaceutics,General Immunology and Microbiology,General Biochemistry, Genetics and Molecular Biology,General Medicine

Reference62 articles.

1. Community Leader of Central Aceh Regency: If the Multiyear Project Is Canceled, We Can Ask for Separation.;F Syam;Aceh Journal National Network.,2020

2. Project Complexity and Risk Management (ProCRiM): Towards modelling project complexity driven risk paths in construction projects.;A Qazi;Int. J. Proj. Manag.,2016

3. The effect of the risk factors on the performance of contractors in Banda Aceh, indonesia.;A Rauzana;ARPN J. Eng. Appl. Sci.,2016

4. Causes of delay in Saudi public construction projects.;J Alsuliman;Alex. Eng. J.,2019

5. Exploring delay causes of road construction projects in Egypt.;R Aziz;Alex. Eng. J.,2016

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3