Abstract
This paper introduces an enhanced energy auditing process including a ring-fencing mechanism for the selection of energy efficiency measures considering a multi-stage planning of the energy retrofitting project. The proposed ring-fencing approach enables SMEs to overcome the barrier of lack of capital for the implementation of energy efficiency measures by implementing first no-cost measures and only after that energy savings are accumulated considering the installation of low-cost, medium-cost and finally high-cost measures. The advantages of the proposed methodology are illustrated by means of three case studies, where a variety of energy efficiency measures were first identified throughout the auditing process involving three different SMEs, then most effective measures were selected and scheduled to be implemented according to a multi-annual plan while considering budget and operational constraints. The results of the pilot studies show that the business owners have improved their decision-making with respect to energy efficiency upgrades by engaging in the auditing process and accepting the recommendations about the suggested interventions to maximize financial (and environmental) benefits.
Funder
Horizon 2020 Framework Programme
Subject
Ocean Engineering,Safety, Risk, Reliability and Quality
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献