Affiliation:
1. Luleå University of Technology Department of Civil Department of Civil Environmental and Natural Resources Engineering: Lulea tekniska universitet Institutionen for samhallsbyggnad och naturresurser
2. Sweco Group: Sweco AB
Abstract
Abstract
Life cycle cost (LCC) analysis is an important tool for effective infrastructure management. It is an essential decision support methodology for selection, design, development, construction, and maintenance of railway infrastructure system. Effective implementation of LCC analysis will assure cost-effective operation of railways from both investment and life-cycle perspectives. A major setback in the successful implementation of LCC by infrastructure managers is the availability of relevant, reliable, and structured data. Different cost estimation methods and prediction models have been developed to deal with this challenge. However, there is a need to integrate prediction models as an integral part of LCC methodology to account for possible changes in the model variables. This article presents an LCC based approach for requirement specification. It integrates degradation models with an LCC model to study the impact of change in design speed on key decision criteria such as track possession time, service life of track system, and LCC. The methodology is applied to an ongoing railway investment project in Sweden to investigate and quantify the impact of design speed change from 250 km/h to 320 km/h. The results from the studied degradation models show that the correction factor for a change in speed varies between 0,79 and 0,96. Using this correction factor to compensate for changes in design speed, the service life of ballasted track system is estimated to decrease by an average of 15%. Further, the LCC of the route under consideration will increase by an expected value of 30%.
Publisher
Research Square Platform LLC
Reference21 articles.
1. Life cycle cost analysis for reinforced geogrid railway track;Alabdullah SFI;GEOMATE J,2020
2. Development of railroad track degradation models;Bing AJ;Transp Res Rec,1983
3. Optimisation model to schedule railway track renewal operations: a life-cycle cost approach;Caetano LF;Struct Infrastruct Eng,2015
4. Calle-Cordón A, Jiménez-Redondo N, Morales-Gámiz J, García-Villena F, Peralta-Escalante J, Garmabaki A, Famurewa SM, Duarte E, Morgado J 2018. Combined RAMS and LCC analysis in railway and road transport infrastructures. Proceedings of the 7th Transport Research Arena TRA
5. Life cycle cost analysis of macro synthetic fibre reinforced concrete for railway sleeper applications;Camille C;Struct Infrastruct Eng,2022