Affiliation:
1. China University of Mining and Technology (Beijing)
2. Kunming University of Science and Technology
Abstract
Abstract
Significant interest has been focused on recovery rates, recovery options, and recovery utilization when tailings impoundments are re-mined. However, the stability of the tailings dams during the recovery process is also a severe issue. Based on engineering geological survey and laboratory tests, the Tongling tailings impoundment’s characteristics of instability evolution under different recovery heights and diverse working conditions were analyzed by numerical simulation. Firstly, with the help of 2D software, the position of the tailings dam infiltration line and the alteration of the dam safety factor during the stoping process were calculated. Secondly, 3Dmine software was used to create the 3D surface structure of the tailings impoundment, and then a 3D numerical analysis model was established by means of Midas GTS NX software. The numerical simulation of seepage and stress analyses were conducted based on the model. Consequently, the evolution of the stability characteristics of tailings dam under different operating conditions was calculated. The research demonstrates that the dry beach length of the tailings pond gradually reduces with the decrease of the extraction height, resulting in a lower infiltration line. Under flood conditions, the saturation line has partial overflow due to the poor seepage discharge capacity of the dam. The total displacement of the dam body is inversely proportional to the retrieval height. The more extreme the analyzed working conditions, the more the safety factor will be reduced. Additionally, the plastic variation area of the dam body will be more comprehensive, which will increase the risk of a dam collapse.
Publisher
Research Square Platform LLC