Multi-objective optimization for the selection of construction sub-contractors considering time, cost, and quality aspects

Author:

Mohammadrezaytayebi Shayan1,Afshar Mohammad Reza1ORCID

Affiliation:

1. Amirkabir University of Technology Department of Civil Engineering: Amirkabir University of Technology Department of Civil and Environmental Engineering

Abstract

Abstract Project managers always try to do their best to conduct their projects as fast as they can. Additionally, not only do they try to reduce the required financial resources, but also they aim to reach the highest possible quality. As a result, time, costs, and quality are three important parameters which need to be considered not only in the process of decision-making but also in the process of conducting a project. For a general contractor, who conducts a significant part of a project by subcontracting, a proper selection of sub-contractors which simultaneously optimizes time, cost, and quality is a great challenge. In this paper, a new model is presented for solving sub-contractor selection problem considering time, cost, and quality aspects. Also, two metaheuristic approaches, namely non-dominated sorting genetic algorithm version III (NSGA-III), and a multi-objective imperialist competitive algorithm (MOICA) are presented for solving the proposed model. Since the effect of different parameters on the performance of the algorithm is significant, the Taguchi method with a novel response value is used to adjust the parameters of the proposed algorithms. Four performance metrics are used to evaluate the outcomes of these algorithms. A comparative study is done to compare the performance of the proposed methods with NSGA-II. The findings demonstrate that the proposed MOICA provides a wide range of options for project manager, while proposed NSGA III improves the quality of solutions in construction projects. When the project is facing many constraints, having more options helps to make more appropriate decisions. The quality of the solutions becomes more important if the project constraints are less. The current study provides an applicable tool for project manager for selection of sub-contractors considering time, cost, and quality aspects. This research also assists general contractor to propose a suitable price in tender stage. As a lack of efficient tool selecting the sub-contractors considering project constraints, this study is one of the first research studies that proposed a tool in order to select sub-contractors so that the project constraints are met.

Publisher

Research Square Platform LLC

Reference19 articles.

1. A type-2 fuzzy set model for contractor prequalification;Afshar MR;Autom Constr,2017

2. An interval type-2 fuzzy MCDM model for work package subcontractor prequalification;Afshar MR,2021

3. Optimal sub-contractor selection and allocation in a multiple construction project: Project portfolio planning in practice;Afshar MR,2021

4. Multi-mode resource constrained multi-project scheduling and resource portfolio problem;Beşikci U;Eur J Oper Res,2015

5. A NSGA-II and NSGA-III comparison for solving an open shop scheduling problem with resource constraints;Ciro GC;IFAC-PapersOnLine,2016

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3