Numerical Simulation and Analysis of the Three-Step Excavation of an Extra-Large Cross-Section and a Low Flat-Ratio Railway Tunnel

Author:

Huo Wenxing1,Shifeng Xue1,Zhao Zongzhi2,Gao Zhiyu3,Shao Mingyue3

Affiliation:

1. China University of Petroleum Huadong

2. CCCC First Highway Engineering Group Co, Ltd

3. CCCC First Highway Engineering Group Co, Ltd

Abstract

Abstract The Xinbaishiyan tunnel in the reconstruction Chengdu-Kunming railway Ermeishan-Mipan section mainly runs through dolomite with dolomitic limestone, with an excavation area of 260 m2, a maximum span of 22.3 m, a maximum height of 14.4 m, a vector height of 7 m, and a rise-span ratio of 0.31. The tunnel has an extra-large cross-section and it is a low flat-ration railway tunnel. This paper mainly describes the the finite element analysis for this tunnel excavation that was used to guide the construction. Finite element software was used to model the tunnel according to the engineering geological conditions of the tunnel. These engineering geological conditions included the rock mass, system bolts, middle pipe shed, steel arch and shotcrete, grouting layer, second lining and so on. Nonlinear construction phase analysis was adopted. The results showed that the maximum vertical deformation of the tunnel vault and the middle of the invert was about 34 mm. The vertical deformation of the tunnel could be divided into an acceleration deformation section, linear deformation section, deceleration deformation section, and stable deformation section. The maximum horizontal deformation in the middle of the side wall was about 12.3 mm. Under the effect of the initial support, the equivalent stress of the side wall gradually increased with the excavation of the steps and the increase of the support structure. The axial force of the bolt in the middle of the side wall was larger than that in other places and the axial force of the middle pipe shed went along with the excavation of the tunnel in waves. The steel arch and the shotcrete had the maximum effective stress at the arch shoulder, which played the role of the deformation and pressure for the surrounding rock. During the construction, the length and height of the three-step method had to be set reasonably. The middle pipe shed and the system bolt supported the rock mass together. In the construction of the extra-large cross section and the flat tunnel, there was no need to set up temporary support, which was convenient for mechanical excavation.

Publisher

Research Square Platform LLC

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Finite Element Analysis of Twin Tunnels in Granitic Rock;Lecture Notes in Civil Engineering;2024

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3