Key parameters of gob-side entry retaining by roof cutting in close-distance seam group

Author:

Hu Chaowen1,Yang Xiaojie2,Li Qian1,Hu Bing3,Li Yongyuan3,Jiang Qi3,Sun Fulong3

Affiliation:

1. China Huaneng Group Co., Ltd

2. China University of Mining and Technology

3. Huaneng Coal Technology Research Co., Ltd

Abstract

Abstract During the process of close-distance seam group mining, the coal pillar in the upper coal seam is a stress-concentrated area, which leads to a loss of stability of the roadway during mining of the lower coal seam. This lack of stability introduces great safety hazards to coal mines. To solve the problem of stress concentration of coal pillars, the method of gob-side entry retaining by roof cutting is proposed to remove the coal pillar. In this study, FLAC3D was used to analyze the depth and angle of pre-split blasting. LS-DYNA was used to analyze the spacing of the blasthole. Using the methods of theoretical analysis and numerical simulation, we determined that the optimal depth of the pre-split blasting was 6 m, the optimal angle for pre-split blasting was 15°, and the optimal spacing of the blasthole was 500 mm. A field test was carried out in the 1010201 ventilation roadway of the Yuwang Coal Mine, China. The on-site peeping results showed that when the spacing of the blasthole is 500 mm, connecting cracks can form under the action of blasting stress. After the working surface is mined, the roof strata could collapse and fill the gob over time when the depth and angle of the pre-split blasting are 6 m and 15°, respectively.

Publisher

Research Square Platform LLC

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3