Affiliation:
1. Nuclear Engineering Seibersdorf GmbH - NES, Seibersdorf, Austria
Abstract
The paper presents work performed in the last phase of the decommissioning of the ASTRA research reactor at the Austrian Research Centers Seibersdorf. Dismantling the pump room installations and the ventilation system, as well as the clearance of the buildings is described. Some conclusions and summary data regarding the timetable, material management, and the cost of the entire project are also presented.
Publisher
National Library of Serbia
Subject
Safety, Risk, Reliability and Quality,Nuclear Energy and Engineering
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献