Abstract
The article studies the development of the long-term marginal cost pricing of electricity in France, in the 1950s and 1960s. The engineers who managed the public monopoly for the production, transport, and distribution of electricity promoted a distinctive version of the economics and engineering nexus. Costs calculations were developed to design a nationwide integrated machine. Hydropower in the south was to be interconnected with thermal power in the north, in order to support a massive increase in consumption in the Paris basin, saving on coal and on the scarce funding of the Marshall Plan. Prices acted as administrative instructions, passing on costs to subscribers and shaping their present and future behavior according to the planned development of the system. This was a technocratic intervention: the engineer-economists made crucial and lasting decisions on land-use planning for the sake of the rapid growth of the system. This engineering and economics nexus was a far cry from the prewar liberal order made of multiple small and loosely regulated competitors, and from contemporary forms of economic engineering, more narrowly focused on the informational properties of prices, abandoning the calculated nationwide decisions on the growth of processes of production and uses. It is also slightly neglected in the discussion over the so-called indicative planning in postwar France.
Subject
Economics and Econometrics,History
Reference39 articles.
1. La tarification des demandes en pointe;Boiteux;Revue géneŕale de l’eĺectricité,1949
2. Le choix des équipements de production électrique;Boiteux;Revue française de recherche opeŕationnelle,1956
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献