Comparative Analysis of Conventional Methods with BIM Methods on Construction Cost Estimate at Structure Project Design Calculations (Case Study of Construction of A Satpol PP Building)

Author:

Ulinnuha Nadira Zalfa,Handayani Fajar Sri,Rifai Muji

Abstract

Construction cost estimate in construction projects requires high accuracy in calculating work volumes and applying unit cost analysis. Lack of accuracy in calculating the volume of work can result in inaccurate cost estimates, causing project budget overruns. This research discusses the use of 3D BIM planning concepts using Autodesk Revit software to help calculate volumes accurately, with the aim of reducing project budget overruns. Comparative analysis of cost estimates between the use of Autodesk Revit and conventional methods provides an overview of the efficiency and effectiveness of using BIM software in estimating construction project costs. The object of this research is the Satpol PP Bantul office construction project, with a focus on structural work. This research method includes data collection, 3D BIM modeling, calculating cost estimates based on the volume produced using unit cost analysis, and comparative analysis of cost estimates between the use of BIM software and conventional methods. Based on the research results, it found that the construction cost estimate for structural work from Revit had a value of IDR 862,330,518.59 and a difference of IDR 53,420,195.31. This shows that the use of the 3D BIM concept results in 5.83% cheaper calculations than conventional construction cost estimate methods.

Publisher

Indonesian Journal Publisher

Reference24 articles.

1. Abdel-Hamid, M. (2023). Project cost control using five dimensions building information modelling. International Journal of Construction Management, 23(3), 405–409. https://doi.org/10.1080/15623599.2021.1880313

2. Aman, Y., Setiawan, E. B., & Abma, V. (2021). Prosiding CEEDRiMS 2021 Inovasi Teknologi dan Material Terbarukan Menuju Infrastruktur PENERAPAN KONSEP BIM DARI STUDI KASUS DAN PERSPEKTIF PENGGUNA.

3. Apriyansyah Risky. (2021). Implementasi Konsep Building Information Modelling (Bim) Dalam Estimasi Quantity Take Off Material Pekerjaan Struktural Implementation The Concept Of Building Information Modelling (Bim) In The Estimation Of Quantity Take Off Materials Of Structural Work.

4. Arya Prio Pamungkas. (2017). 178110079 - Arya Prio Pamungkas Fulltext.

5. CRC Construction Innovation. (2007). Adopting BIM for facilities management Solutions for managing the Sydney Opera House.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3