1. Zamyshliaev A.M., Shubinsky I.B. [Development of the URRAN project through the construction of a technical asset management system]. Zheleznodorozhny transport 2019;12:19-27. (in Russ.)
2. Zamyshliaev A.M. European railway operators’ experience in managing the dependability and safety of technical assets using advanced digital technologies. Dependability 2020;3:27-33.
3. Gapanovich V.A., Shubinsky I.B., Zamyshlyaev A.M., Rozenberg E.N. System for adaptive management of railway infrastructure maintenance (URRAN project). Dependability 2015;14-22.
4. Gapanovich V.A., Shubinsky I.B., Zamyshlyaev A.M. Risk assessment of a system with diverse elements. Dependability 2016;2(49):49-53.
5. Shubinsky I.B., Zamyshliaev A.M., Pronevich O.B. Graph method for evaluation of process safety in railway facilities. Dependability 2017;1:40-45.