Optimization study of blasting operations in Roşia Poieni open pit mine, Romania

Author:

Toderas MihaelaORCID

Abstract

Purpose. Drilling-blasting technology is one of the simplest and most often used techniques in open pit mining. This allows the excavation of a large volume of rock and useful mineral substance. The operation of blasting using the energy of explosives plays an important role in open pit exploitation, being also the key element of the blasting process through which a corresponding granulometry is obtained. This operation is a part of a series of interdependent operations, in the sense that each operation determines a certain result that will be an important element for the next operation that takes place in the working face. Consequently, the blasting operation with explosives should not be considered as an independent act. A global approach to the entire production technological process including blasting is required. Methods. In the optimization study, the basic method consisted in the analysis of the blasting operations performed at the drilling diameter of 250 mm (blasting technology used in Roşia Poieni open pit mining) and simulation of the excavation of the same rock volume, with the optimization of the explosive charge distribution at two other drilling diameters: 200 and 150 mm. Findings. The main problems when shooting 250 mm dia holes are caused by the length of the tamping in the mineralized rock that leads to the appearance of blocks with dimensions which are maximum allowed in the crusher tank (1.2-1.3 m). That is why discontinuous loads with intermediate tamping are used – the method that successfully limits their number. In order to obtain a granulometry corresponding to the primary crushing operation, which will allow to decrease the crushing costs, it is necessary to use smaller drilling diameters, but with productivity high enough to ensure the optimal development of the extraction process. Originality. Based on the performed study, it is recommended to use the discontinuous load, preserving the total length of the explosive charge. In the zones where the rocks have a Protodiakonov coefficient f > 6.5, it is recommended to apply an appropriate drilling diameter (150-200 mm) and use the intermediate tamping at 2-3 m length to limit the upper stemming area to a maximum of 7 m (to limit or eliminate the occurrence of oversized blocks). Practical implications. The research results will enhance the geometric and safety factors of the operation, limiting the explosion effect on the massif and the environment and reducing the total costs of the cutting operation. The cost of explosives and initiating materials can be reduced by using a smaller quantity of explosive gels in a dry environment (12-18 kg/hole), the difference in the explosive charge length being completed with AM 1.

Publisher

Dnipro University of Technology

Subject

Geochemistry and Petrology,Geotechnical Engineering and Engineering Geology

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3