Solutions to prevent face spall and roof falling in fully mechanized longwall at underground mines, Vietnam

Author:

Vu Tien Trung

Abstract

Purpose. On the basis of analysis and assessment of geological conditions, technological parameters and support methods of a longwall, the author has pointed out the causes and rules of the phenomenon of face spall and roof falling in fully mechanized longwall. From there, the author proposes some solutions to prevent this phenomenon to ensure the safety of the longwall. Methods. The statistical, survey and analysis methods of actual field data are used to achieve research results. Findings. The results of applying solutions to prevent the phenomenon of face spall and roof falling are relatively good. There are some effective solutions such as the technique of force-pumping chemicals directly into the coal seam to increase the connection among the coal masses, the solution of force-pumping water into the seam combined with enhanced support at the place of face spall and roof falling on a small scale. Originality. There are many reasons and factors that cause the phenomenon of face spall and roof falling in the longwalls. In the present paper, the author focuses on 5 main causes and factors ruling face spall and roof falling in longwalls. On that basis, the author proposes 5 solutions that can be applied to prevent the face spall and roof falling in geological conditions of longwalls in Quang Ninh coalfield, Vietnam. Practical implications. The research results presented in the article will help mines be proactive in production. These technical solutions, after being applied in actual production, allowed to achieve quite good results, and effectively handled the phenomenon of face spall and roof falling in the longwall according to each specific geological condition. Thus, it is possible to develop technical and technological solutions for troubleshooting in fully mechanized longwall at some current underground mines of Quang Ninh coalfield, Vietnam.

Publisher

Dnipro University of Technology

Subject

Geochemistry and Petrology,Geotechnical Engineering and Engineering Geology

Reference25 articles.

1. Guo, W., & Chen, J. (2010). Longwall mining. Beijing, China: Beijing Science Press.

2. Yuanwei, S., Yu, N., & Qingxin, Q. (2006). Strata control and technology optimization for fully mechanized coalface using top-coal caving. Beijing, China: China University of Mining and Technology Press.

3. Dou, L., & Cao, S. (2010). Strata control in coal exploitation. Beijing, China: China University of Mining and Technology Press.

4. Vu, D.T., & Tran, V.T. (2008). Underground coal mining technology. Hanoi, Vietnam: Transport Publishing.

5. Decision No. 403/QD-TTg on approving adjustment of Vietnam coal industry development planning to 2020, with prospects to 2030. (2016). The Prime Minister.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3