When determining the success of a road project, cost is one of the most important variables to consider. This is because cost is the project’s backbone and driving force throughout the construction process. As a result, to assess the cost performance of a road project, the actual cost is compared to the planned cost. This research aims at uncovering the causal variables that contribute to cost overruns on road projects using Accra, Ghana as a case study. Relevant literature was thoroughly reviewed to extract identified factors. This study adopted a quantitative research approach, using a questionnaire developed to collect data from the target audience. The questionnaire survey was conducted using civil engineers and quantity surveyors working in the Ghanaian construction sector. The data that were retrieved were analysed using descriptive statistics and exploratory factor analysis. According to the findings, the main reasons driving cost overruns on road projects include consultant/ contractor-related, environment-related, economy-related, risk/uncertainty-related, technical-related, owner/client-related, and other project-related factors. It was determined that cost overruns in construction projects occurred because of a lack of professionalism on the part of the stakeholders engaged in the construction process from start to finish. Future research may therefore be conducted utilising all of Ghana’s regions to obtain a broad view of the research.
Publisher
Riga Technical University
Subject
Building and Construction,Civil and Structural Engineering
Reference50 articles.
1. Abdullah, M. S., Alaloul, W. S., Liew, M.S., & Mohammed, B. S. (2018). Delays and cost overruns causes during construction of palm oil refinery projects. MATEC Web of Conferences, 203, Article 02004. https://doi.org/10.1051/matecconf/201820302004
2. Acharya, N. K., Lee, Y. D., Kim, S. Y., Lee, J. C., & Kim, C. S. (2006). Analysis of construction delay factor: A Korean perspective. In: 7th Asia Pacific Industrial Engineering and Management Systems Conference, 883–895.
3. Affleck, R. T., & Freeman, R. (2010). Challenges for engineering design, construction, and maintenance of infrastructure in Afghanistan (ERDC/CRREL SR-10-2). Engineer Research and Development Center, Hanover, NH Cold Regions Research and Engineering Lab.
4. Aibinu, A. A. A., & Jagboro, G. O. G. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20(8), 593–599. https://doi.org/10.1016/S0263-7863(02)00028-5
5. Al-Khaldi, Z. (1990). Factors affecting the accuracy of construction costs estimating in Saudi Arabia [Master Thesis, King Fahd University of Petroleum & Minerals], Saudi Arabia. https://core.ac.uk/download/pdf/146512569.pdf
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献