Establishing MR&R Costs for a Network-Level Bridge Management System

Author:

Adams Teresa M.1,Barut Joseph F.2

Affiliation:

1. Department of Civil and Environmental Engineering, University of Wisconsin, Madison, WI 53706

2. Division of Transportation Infrastructure Development, Wisconsin Department of Transportation, 4802 Sheboygan Ave., Room 733, Madison, WI 53707

Abstract

The development of standardized maintenance, repair, and rehabilitation (MR&R) cost data for a network-level bridge management system (BMS) is presented. The Pontis BMS requires several data inputs, including the agency’s costs to perform bridge maintenance actions. Most states that are implementing Pontis do not have historical cost data standardized according to MR&R action, element, and condition state as required. The development of a questionnaire for collecting MR&R costs is described. The questionnaire was used to collect the estimated costs of MR&R actions on 25 bridge elements. Standard definitions of the physical characteristics for the elements were developed. Direct and indirect factors that influence MR&R costs were identified and organized into scenarios corresponding to the extreme minimum and maximum costs. The cost data collected by the questionnaire were analyzed. Procedures for assessing the variability of the estimated costs are presented. The coefficient of variation was used to measure the relative variability of estimated costs. One-way analysis of variance was used to assess the variation in estimated costs among the elements and MR&R actions. A multiple comparisons with the best analysis was used to identify certain elements and MR&R actions with greatest and least variations in cost. The results of this paper include recommended costs for the MR&R actions on 25 elements for the state of Wisconsin.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

Reference8 articles.

1. Federal Register. Vol. 58, No. 39. U.S. Department of Transportation, 1993.

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Risk-based importance factors for bridge networks under highway traffic loads;Structure and Infrastructure Engineering;2018-12-21

2. Life cycle cost optimisation in highway concrete bridges management;Structure and Infrastructure Engineering;2013-10-30

3. Estimating Agency Cost of Maintenance, Repair, and Rehabilitation for Florida Bridges;Transportation Research Record: Journal of the Transportation Research Board;2002-01

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3