Early Contractor Involvement and Target Pricing in U.S. and UK Highways

Author:

Molenaar Keith R.1,Triplett James E.2,Porter Jerry C.3,DeWitt Steven D.4,Yakowenko Gerald5

Affiliation:

1. Department of Civil, Environmental, and Architectural Engineering, University of Colorado at Boulder, Campus Box 428, Boulder, CO 80309-0428.

2. United Contractors, Inc., 5562 Pendergrass Boulevard, Great Falls, SC 29055.

3. Kiewit Corporation, 1000 Kiewit Plaza, Omaha, NE 68131.

4. North Carolina Department of Transportation, P.O. Box 25201, Raleigh, NC 27611.

5. Federal Highway Administration, HIPA-30, Room 3134, 400 Seventh Street, Southwest, Washington, DC 20590.

Abstract

A U.S. panel of federal, state, and private-sector professionals traveled to Canada and Europe in May 2004 to conduct a scan of construction management practices for effective project delivery, contract compliance, and quality assurance. The purpose of this research was to review and document international policies, practices, and technologies for potential application in the United States. The research team observed construction management methods that promote alignment of team goals, integrated use of risk analysis techniques, strategic use of alternative delivery methods, procurement systems that set a framework for success, contract payment methods that support alignment and trust, a delegation of traditional highway agency functions to promote efficiency, a philosophy of network management, and a greater partnership between public and private agencies. One of the significant discoveries dealt with the use of target pricing by the Highways Agency in England on its early contractor involvement projects. As a result of this scan finding, a target pricing proposal was submitted to the South Carolina Department of Transportation (DOT). Additionally, it was discovered after the scan that a form of target pricing has been employed in the state of Washington. Target pricing concepts from the Highways Agency in England, South Carolina DOT, and Washington State DOT are summarized. The aim of the target pricing technique is to align team goals by establishing the contractor's role early in the project development process and then sharing risks rationally and equitably through to project completion.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

Reference3 articles.

1. Construction Management Practices in Canada and Europe. Report FHWA-PL-05-010. International Technology Program. FHWA, U.S. Department of Transportation, 2005.

2. 2001 European Contract Administration Scan. FHWA-PL-03-002, International Technology Program. FHWA, U.S. Department of Transportation, 2002.

3. Early Contractor Involvement Contract Guidance Manual. ECI Model Contract, Issue 1, Revision 1. Highways Agency, London, 2004.

Cited by 21 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. A systematic search and review of early contractor involvement in construction project development;Built Environment Project and Asset Management;2024-08-20

2. Supporting activities in public infrastructure projects that benefit most from ECI: Focus on the design sub-phase;Procedia Computer Science;2024

3. Which contractor competencies are valuable for the client in the pre-construction phase?;Procedia Computer Science;2023

4. Variations on Construction Manager-at-Risk Project Delivery;The Engineer’s Project Delivery Method Primer;2022-05-19

5. Cost Escalation in Road Construction Contracts;Transportation Research Record: Journal of the Transportation Research Board;2021-04-02

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3