Affiliation:
1. Institute of Transport Studies, Department of Civil Engineering, Monash University, Building 60, Clayton, Victoria 3800, Australia.
Abstract
Rail overcrowding has become endemic for many major cities. Solutions are problematic because they require substantial funding and years to implement. A new approach implemented in Melbourne, Australia, called the early bird ticket, offers passengers free rail travel if trips are completed before 7:00 a.m. The program costs $6 million Australian dollars (US$5.64 million; AU$1 = US$.94, 2010) per annum in lost fare revenues. Approximately 8,000 to 9,000 passengers use the ticket each weekday. Some 23% of these passengers have shifted the time of travel (2,000–2,600 passengers) by an average of 42 min. This shift has reduced demand during peak time between 1.2% and 1.5% from previous levels and is the equivalent of a maximum of five average train loads (or 3% of total peak trains). Demand growth during this period has far outweighed this effect; overloading increased after the early bird program was introduced. Its effect was to reduce the scale of increased overloading. Overall, it is unclear to what degree the early bird ticket program has acted to reduce overloading. Peak travel during the less critical 7:00 to 8:00 a.m. peak time has been reduced; however, its effect during the critical 8:00 to 9:00 a.m. peak time is low. Regardless, the program pays for itself by providing relief equivalent to 2.5 to five peak train loads. Economic benefits are likely to be higher. When considering the alternatives, there is no equivalent measure that could be implemented at such cost so quickly.
Subject
Mechanical Engineering,Civil and Structural Engineering
Cited by
40 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献