Concrete Slab Track State of the Practice

Author:

Tayabji Shiraz D.1,Bilow David2

Affiliation:

1. Construction Technology Laboratories, Inc., 5565 Sterrett Place, Suite 312, Columbia, MD 21044

2. Engineered Structures Group, Portland Cement Association, 5420 Old Orchard Road, Skokie, IL 60077

Abstract

Railway track technology has evolved over a period of 150 years since the first railroad track on timber ties was introduced. For much of this period, the conventional track system, commonly referred to as the ballasted track system, has consisted of certain components including rails, ties, ballast, and the subgrade (roadbed). Over the last 20 years, there has been an increase in the use of concrete slab technology for transit, commuter, and high-speed train applications. Essentially, a slab track consists of a concrete slab placed on a subbase over a prepared subgrade. The rails may be directly fastened to the concrete slab, or the rails may be placed on concrete blocks or another slab system that is placed on (or embedded in) the underlying concrete slab. A version of the slab track, developed in the Netherlands, incorporates rails embedded in a trough in the slab and surrounded by elastomeric material. The slab track systems for passenger service applications incorporate several requirements to mitigate noise and vibration. The slab track system for transit applications in the United States and for high-speed rail in Europe and Japan has performed well over the last 20 years. Also, the limited application of the slab track system for mixed passenger service-freight operations has also exhibited good performance. Because of the continued increase in gross tonnage expected to be carried by railroads and the expected growth in high-speed passenger rail corridors, with the smaller deviation in the rail geometry allowed for high-speed rail, the need for a stronger track structure is apparent. At-grade concrete slab track technology is expected to fill the need for stronger track in the United States. The state of the practice related to concrete slab track technology is summarized.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

Reference21 articles.

1. Railroads Cautious on Y2K Capital Projects. Railway Track & Structures, Vol. 97, No. 1, Jan. 2000.

Cited by 27 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3