Affiliation:
1. Department of Civil and Environmental Engineering, Clarkson University, Potsdam, NY 13699-5710
Abstract
Main-line toll plazas are major bottlenecks on toll roads. The capacity and level-of-service analysis of these facilities, however, have not been addressed by the various versions of the Highway Capacity Manual. Traffic operations at toll plazas can be realistically analyzed through computer simulation, but there is a need for a simple analytical delay model that can provide quick and reasonably accurate estimates to help with the planning of toll plazas. Such a delay model is formulated and calibrated on the basis of simulation results. For volume to capacity ratios below 1.4, discrepancies between the estimates obtained from this delay model and from computer simulation are mostly less than 10 percent.
Subject
Mechanical Engineering,Civil and Structural Engineering
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献