Measured Pile Setup During Load Testing and Production Piling: I-15 Corridor Reconstruction Project in Salt Lake City, Utah

Author:

Attwooll William J.1,Holloway D.2,Rollins Kyle M.3,Esrig Melvin I.4,Sakhai Si5,Hemenway Dan6

Affiliation:

1. Terracon, 301 N. Howes, Fort Collins, CO 80521

2. InSituTech, 5 del Valle, Orinda, CA 94563

3. Department of Civil and Environmental Engineering, Brigham Young University, 368 Clyde Building, Provo, UT 84602

4. URS-Woodward Clyde, 201 Willowbrook Boulevard, Wayne, NJ 07470

5. Utah Department of Transportation, 4501 S. 2700 W., West Valley City, UT 84119

6. Wasatch Constructors, 480 N. 2200 W., Building B, 2nd Floor, Salt Lake City, UT 84116

Abstract

As part of the I-15 Corridor Reconstruction Project through downtown Salt Lake City, nine sets of full-scale load tests were performed at locations selected as representative of the subsurface conditions along the corridor alignment. Static compression, uplift, and lateral load tests were conducted at each test site location. The test program included dynamic monitoring of pile installation and restrike events using high-strain testing and analysis methods. Dynamic test results from restrike events on companion piles compared well with the measured static axial compression load test capacities. Subsurface conditions along the alignment range from deep clays to dense alluvial sands above the groundwater table. The piles derive their support from shaft friction or a combination of shaft friction and endbearing, depending on the strata present. The test and subsequent production piles are consistently indicating large capacity gains with time (setup), regardless of the subsurface conditions. The setup in the soft to stiff lakebed clays is attributed to remolding of the clays during pile driving and subsequent reconsolidation. The setup in the dense sands is comparable with setup described by others in dense marine sands. Relationships were developed to predict long-term pile capacity based on dynamic test results from the end of installation and on data from the beginning of restrike. These relationships are being used during production pile installation and restrike events as an integral part of pile evaluation, troubleshooting, and quality control/quality assurance acceptance procedures.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3