Affiliation:
1. Department of Civil and Environmental Engineering, University of Waterloo, 200 University Avenue West, Waterloo, Ontario N2L 3G1, Canada.
Abstract
Over the past decade, there has been a movement in North America toward a performance-based contract (PBC) model for maintaining and managing road networks. In traditional method-based contracts, the owner agency specifies techniques, materials, methods, and quantities, along with the time period for the contract. By contrast, in a PBC, the client agency specifies certain clearly defined minimum performance measures to be met or exceeded during the contract period. PBC is a type of contract in which payments are explicitly linked to the contractor's successfully meeting or exceeding certain clearly defined minimum performance indicators. Therefore, the selection of a PBC model for maintenance and rehabilitation differs significantly from that of a traditional asset management contract. Also, a PBC is more complex because of the pavement deterioration process and probability of failure to achieve the specified level of service for various performance measures along the contract period. A novel framework was developed for the selection of maintenance and rehabilitation activities with a model for pavement performance prediction and linear optimization. A case study based on data from the second generation pavement management system of the Ministry of Transportation Ontario is used to illustrate the framework.
Subject
Mechanical Engineering,Civil and Structural Engineering
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献