Roles and Responsibilities of Independent Cost Estimator in Construction Manager–General Contractor Highway Construction

Author:

Alleman Douglas1,Duval Richard B.2,Molenaar Keith R.1

Affiliation:

1. Construction Engineering and Management, Department of Civil, Environmental, and Architectural Engineering, College of Engineering and Applied Science, 428 UCB, University of Colorado at Boulder, Boulder, CO 80309-0428

2. Construction and Project Management Research, Office of Infrastructure Research and Development, Federal Highway Administration, 6300 Georgetown Pike, McLean, VA 22101

Abstract

The use of construction manager–general contractor (CM-GC) project delivery is gaining momentum with highway projects across the United States. This project delivery process is different from the traditional design–bid–build (D-B-B) process in that an agency works with one CM-GC to develop the construction cost. To ensure that agencies receive fair market value, many agencies employ an independent cost estimator (ICE) in lieu of competitive bidding. The findings of a research effort to explore ICE roles, responsibilities, and best practices within highway construction are presented. The findings were derived through a review of previous literature, current agency CM-GC ICE policies, surveys of 25 completed CM-GC projects, and in-depth interviews with highway agency officials on six of the projects. The six projects were selected for interviews from the set of completed projects to allow for cross-case comparison. Although multiple best practices are identified, the two key findings of the research are that the ICE should have construction experience and local knowledge and should be an involved team member throughout the design process. In summary, all of the reviewed agencies found the ICE role to be essential in establishing a competitive construction contract cost and thereby gaining value through early contractor involvement. Some agencies found that the ICE added value beyond the costing process as a team member throughout design, but this practice was not found to be universal across all projects studied.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

Reference8 articles.

1. Quantification of Cost, Benefits and Risk Associated with Alternative Contracting Methods and Accelerated Performance Specifications. FHWA, U.S. Department of Transportation, 2013–2016.

2. Construction Manager-at-Risk Project Delivery for Highway Programs

3. AlderR. Alternative Contracting Process–SEP 14 Construction Manager General Contractor Utah DOT Annual Report 2011. Utah Department of Transportation, Salt Lake City, 2012, pp. 15–16.

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Exploring a Progressive Design-Build Best-Value Delivery Method in Highway Construction;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2021-02

2. Project Delivery Methods’ Change-Order Types and Magnitudes Experienced in Highway Construction;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2020-05

3. Challenges of Implementing Progressive Design-Build in Highway Construction Projects;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2020-02

4. Comparing Contract Administration Functions for Alternative and Traditional Delivery of Highway Projects;Journal of Management in Engineering;2020-01

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3