Project Scoping Process Model Development to Achieve On-Time and On-Budget Delivery of Highway Projects

Author:

Kermanshachi Sharareh1,Anderson Stuart D.2,Goodrum Paul3,Taylor Timothy R. B.4

Affiliation:

1. Department of Civil Engineering, University of Texas at Arlington, 425 Nedderman Hall, 416 Yates Street, Box 19308, Arlington, TX 76019

2. Zachry Department of Civil Engineering, Texas A&M University System, 3136 TAMU, College Station, TX 77843

3. Civil, Environmental, and Architectural Engineering, University of Colorado at Boulder, UCB 428, Boulder, CO 80309

4. College of Engineering, Department of Civil Engineering, University of Kentucky, 151A OHR, Lexington, KY 40506

Abstract

Transportation agencies have significantly improved many aspects of project delivery, yet they continue to be challenged by cost increases and time delays that occur after a project is programmed and funded. An increase or a change in the scope of a project to improve facility performance is a common source of such cost increases and schedule delays. Therefore, this study focused on improvement in the project scoping process (PSP) to achieve on-time and on-budget delivery of highway projects. The thrust of this research was to develop a framework that could help transportation agencies improve their scope development processes and practices. A key effort in this study was to assess current project scoping practices. After a literature review, the research team developed a survey protocol, distributed questionnaires, collected survey data, and performed data analysis. Forty responses were received that represented 23 state transportation agencies (STAs). On the basis of the survey responses, six STAs were selected for face-to-face interviews. The intent of the interviews was to confirm survey results and delve into topics not covered in the survey. As a result of these tasks, the research team identified considerable variation in scope development processes across the agencies with respect to the definition of a PSP, formality of the process, timing of the PSP, and project maturity when a project is programmed. On the basis of what was learned from the literature review, surveys, and follow-up interviews, the research team developed a PSP definition and framework. This PSP framework contains three major actions, namely, to select the project, to analyze the project, and to advance the preferred alternative.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

Reference11 articles.

Cited by 25 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3