Design–Build Replacement of US-90 Bridge over Bay St. Louis, Mississippi

Author:

Blakemore Frank P.1,Konda Travis F.1

Affiliation:

1. HNTB Corporation, 715 Kirk Drive, Kansas City, MO 64105.

Abstract

As part of the rebuilding efforts after Hurricane Katrina, the Mississippi Department of Transportation awarded a design–build contract for the replacement of the 2.1-mi-long US-90 bridge spanning Bay St. Louis. With a January 25, 2006, start date, the deadline for opening two lanes of traffic was May 16, 2007, followed by a February 15, 2008, deadline for opening the entire bridge. The bridge was constructed as two separate structures except for the navigation unit, where the deck and substructure are continuous between the eastbound and westbound structures. To allow for such an aggressive construction schedule, several concepts were used. Plans were delivered in stages to allow construction to proceed before the final submittal. The use of precast components including girders, piles, and capbeams was maximized. Pile bents to a height of 75 ft above fixity were used, with no battered piles. The pile and girder sections were varied to allow for utilization of more precast fabricators. Precast, prestressed piles, ranging in length from 50 to 164 ft, form the bridge foundations of the pile bents (24- and 36-in. piles) and waterline footings (30-in. piles). Typical superstructure elements consist of BT-78 girders (maximum span of 154 ft) and AASHTO Type IV girders (maximum span of 112 ft). A spliced haunch girder system with a 250-tt main span and 200-ft end spans was implemented at the navigational channel to satisfy the vertical and horizontal clearances.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

Reference6 articles.

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Emergency Megaproject Case Study Protest: The Interstate Highway 35 West Bridge;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2017-08

2. MATERIAL TRANSSHIPMENT FOR PRECAST FABRICATION;Journal of Civil Engineering and Management;2013-06-14

3. Early Contractor Design Involvement to Expedite Delivery of Emergency Highway Projects;Transportation Research Record: Journal of the Transportation Research Board;2013-01

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3