Urban Ferries and Catastrophic Floods

Author:

Burke Matthew I.1,Sipe Neil23

Affiliation:

1. Urban Research Program, Griffith University, 170 Kessels Road, Nathan, Queensland 4121, Australia.

2. Griffith School of Environment, Griffith University, 170 Kessels Road, Nathan, Queensland 4121, Australia.

3. School of Geography, Planning, and Environmental Management, University of Queensland, Building 35, Level 4, Brisbane, Queensland 4072, Australia.

Abstract

Both Brisbane, Queensland, Australia, and New York City have experienced catastrophic weather events in recent years. In January 2011, the Brisbane River flooded, inundating more than 20,000 houses; in October 2012, superstorm Hurricane Sandy hit New York City and produced a major storm surge that flooded much of the city. Ferry systems in both cities were badly affected. Comparative research was used to explore how each city's ferry operators and managers addressed the impacts before, during, and after those events. A review of published materials related to the two systems during and after the disasters was supplemented by interviews with key agency personnel in each city, conducted in mid-2013. Results suggest that how ferries are affected by floods and other disasters and how ferries may be used to rapidly respond to and provide for post-flood transport needs depend entirely on context. The linear river ferry operations of Brisbane suffered much terminal damage, and operations were unable to recommence service as a result of debris and the swollen nature of the river for many weeks after the flood. In contrast, within 2 days, New York City ferries were reintroduced on key routes and were introduced to new emergency locations to provide mobility for citizens who were unable to use other transport modes because of storm damage. The lessons learned by the operators include essential areas that authorities must address before a disaster: infrastructure design and resilience, disaster planning, insurance and legal requirements, staff management, and coordination during the reconstruction phase. Findings suggest that authorities can significantly reduce damage and improve recovery times if they plan and prepare for such events well ahead of time.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3