Affiliation:
1. Metropolitan Transportation Authority Metro–North Railroad, Floor 12, 347 Madison Avenue, New York, NY 10017.
Abstract
The Metropolitan Transportation Authority's Metro–North Railroad, which serves 120 stations located in New York and Connecticut, is considered by many to be the nation's premier regional railroad. In 2012, Metro–North provided service to 83 million people, with an on-time record of 97.6%. Like many U.S. commuter railroads, Metro–North uses manual, onboard visual inspection methods to collect fares or to verify that a valid, time-based ticket is held by a customer. If not enough personnel are available to perform these functions, revenue can be lost. If an engineer or conductor assignment is vacant, train service is annulled. Engineers and conductors thus are assigned at levels at which this possibility rarely, if ever, occurs. The cost of insufficient ticket collectors on board depends on the presumed revenue loss, should a specific assignment remain unfilled, because this insufficiency results in fares that are not collected or verified. Metro–North had found it increasingly difficult to staff all ticket collector assignments each day as a result of fluctuating staff absentee levels and unscheduled work. To hire more staff is one way to reduce overtime and fill assignments, but doing so results in a rise in costs in wages and benefits. To address these trade-offs and the associated potential revenue loss, Metro–North built a workforce planning model to determine the optimal number of engineers, conductors, and especially ticket collectors. The model takes into account numerous supply, demand, and cost variables and then determines the most cost-effective solution.
Subject
Mechanical Engineering,Civil and Structural Engineering
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献