Select Bus Service on M15 in New York City

Author:

Beaton Eric B.1,Barr Joseph E.2,Chiarmonte Joseph V.3,Orosz Theodore V.4,Paukowits Dominique5,Sugiura Aaron1

Affiliation:

1. New York City Department of Transportation, 55 Water Street, 9th Floor, New York, NY 10041

2. Parsons Brinckerhoff, 75 Arlington Street, 9th Floor, Boston, MA 02116

3. A17.40, MTA New York City Transit, 2 Broadway, New York, NY 10004

4. A17.53, MTA New York City Transit, 2 Broadway, New York, NY 10004

5. FTA, U.S. Department of Transportation, 1200 New Jersey Avenue SE, 5th Floor, Washington, DC 20590.

Abstract

Constrained and congested streets hinder accelerated transit service and the provision of protected space for cycling. Although bus rapid transit has proved effective at improving transit service in cities, the addition of a physical priority for transit must be balanced against competing needs for traffic flow and parking, particularly in areas with high levels of activity. On October 10, 2010, the New York City Transit Authority of the Metropolitan Transportation Authority—now known as MTA New York City Transit—and the New York City Department of Transportation implemented the M15 select bus service on First and Second Avenues. This bus rapid transit service generated a significant improvement to transit service in a constrained corridor and created space for safe bicycling facilities and pedestrian safety improvements, and all general traffic flow along the corridor was maintained. The M15 select bus service improved bus speed and reliability with proof-of-payment fare collection, new bus lanes, and improved bus lane treatments, including offset bus lanes (next to the parking lane). Passenger comfort and reliability were also enhanced through route simplification, improved scheduling, enhanced stations, and better customer information. The results have been noteworthy, with a 15% to 18% improvement in travel time and a 10% increase in corridor ridership. Cycling has also increased substantially along the corridor, on which new parking-protected bike lanes were installed as part of the project. These gains were achieved through close coordination with all corridor stakeholders, careful use of priority treatments on parts of the corridor, and the close working partnership between the New York City Department of Transportation and MTA New York City Transit.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Strategies and Barriers in Effective Bus Lane Implementation and Management: Best Practices for Use in the Greater Washington, D.C. Region;Transportation Research Record: Journal of the Transportation Research Board;2018-08-30

2. Rider perception of a “light” Bus Rapid Transit system - The New York City Select Bus Service;Transport Policy;2016-07

3. Ridership Response to Incremental Bus Rapid Transit Upgrades in North America;Transportation Research Record: Journal of the Transportation Research Board;2015-01

4. Designing the Modern Multimodal Urban Arterial;Transportation Research Record: Journal of the Transportation Research Board;2015-01

5. Factors Contributing to Bus Lane Obstruction and Usage in New York City;Transportation Research Record: Journal of the Transportation Research Board;2014-01

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3