Abstract
It is shown that the creation of the variants of resource-saving systems for the development of long-column mining is one of the main directions for improving the technological schemes for mining operations in the mines of the Kuang Nin coal basin. They provide a reduction in coal losses in the inter-column pillars and the cost of maintaining preliminary workings fixed with anchorage. The implementation of these directions is difficult (and in some cases practically impossible) when tight rocks are lying over the coal seam, prone to significant hovering in the developed space. In the Quang Ninh basin, 9-10 % of the workings are anchored, the operational losses of coal reach 30 % or more; up to 50 % of the workings are re-anchored annually. It is concluded that the real conditions for reducing coal losses and the effective use of anchor support as the main support of reusable preliminary workings are created when implementing the idea put forward at the St. Petersburg Mining University: leaving the coal pillar of increased width between the reused mine working and the developed space and its subsequent development on the same line with the stoping face simultaneously with the reclamation of the reused mine working.
Publisher
Saint-Petersburg Mining University
Subject
Economic Geology,Geology,Geotechnical Engineering and Engineering Geology,Energy (miscellaneous)
Reference50 articles.
1. Абрамкин Н.И., Фам Дик Тханг. Обоснование направлений комплексной механизации очистных работ на наклонных угольных пластах средней мощности в горно-геологических условиях на шахте «Куангхань» // Горный информационно-аналитический бюллетень. 2017. № 1. C. 202-210.
2. Агафонов В.В., Шавров П.В. Анализ методов определения эффективных форм развития технологических систем угольных шахт // Горный информационно-аналитический бюллетень. 2011. № 10. С. 9-12.
3. Зубов В.П. Состояние и направления совершенствования систем разработки угольных пластов на перспективных угольных шахтах Кузбасса // Записки Горного института. 2017. Т. 225. С. 292-297. DOI: 10.18454/PMI.2017.3.292
4. Dao Viet Doan, Bai Xia, Van Diep Dinh. Control technology for coal roadway with mudstone interlayer in Nui Beo coal mine // International Journal of GEOMATE. 2019. Vol. 17. Iss. 60. P. 259-266. DOI: 10.21660/2019.60.39560
5. Калинин С.И., Роут Г.Н., Игнатов Ю.М., Черданцев А.М. Обоснование суточной добычи угля из лавы длинной 400 метров в условиях шахты им. В.Д.Ялевского // Вестник Кузбасского государственного технического университета. 2018. № 5. C. 27-34. DOI: 10.26730/1999-4125-2018-5-27-34
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献