Subject
Industrial and Manufacturing Engineering,General Materials Science
Reference37 articles.
1. Abdallah, K. S., & Jang, J. (2019). Famıly Splıttıng Algorıthm For A Sıngle Machıne Total Tardıness Schedulıng Problem Wıth Job Famıly Setup Tımes. International Journal of Industrial Engineering, 26(4).
2. A. Allahverdi, “The third comprehensive survey on scheduling problems with setup times/costs,” European Journal of Operational Research, vol. 246, no. 2, pp. 345–378, 2015.
3. Allahverdi, A. and Soroush, H.M. (2008). The significance of reducing setup times/setup costs. European Journal of Operational Research, 187(3):978-984.
4. Altıntaş M., 2010. Patron Yapısının Bobin Boyamaya Etkisinin Araştırılması. Pamukkale Üniversitesi Fen Bilimleri Enstitüsü Yüksek Lisans Tezi, Denizli.
5. Crauwels, H. A. J., Potts, C. N., & Van Wassenhove, L. N. (1996). Local search heuristics for single-machine scheduling with batching to minimize the number of late jobs. European Journal of Operational Research, 90(2), 200-213.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献