Affiliation:
1. School of Electric Power Engineering South China University of Technology Guangzhou China
Abstract
AbstractThis study introduces a strategy for the pre‐allocation and dispatch of mobile power sources (MPSs) within a power‐transportation coupled network, targeting efficient distribution network fault recovery under extreme weather conditions. The strategy incorporates the Dijkstra algorithm and blind number theory to analyse the MPS driving path and generate fault scenarios respectively, considering the effects of extreme weather on traffic capacity and distribution network fault rate. The MPS pre‐allocation model, formulated to minimize the load outage loss, MPS investment, and driving fuel cost, provides a foundation for optimization of the dispatch process. The dispatch optimization model adapts to dynamic information from the power‐transportation coupled network to make decisions on load restoration sequencing and MPS driving path. The effectiveness of the proposed strategy is demonstrated through an application to the IEEE 33‐node distribution system and a corresponding 33‐node transportation network.
Publisher
Institution of Engineering and Technology (IET)
Subject
Renewable Energy, Sustainability and the Environment
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献