1. Technical feasibility study of the HVDC link Bericevo–Divaca–Salgareda (PCI Project HVDC 1000 MW Slovenia–Italy),2016
2. The grid code, issue 5 Rev. 1,2012
3. System requirements concerning the connection of high voltage direct current links to the Fingrid Oyj's AC grid