Affiliation:
1. School of Electric Power Engineering South China University of Technology Guangzhou China
2. Department of Electrical, Electronic and Information Engineering University of Bologna Bologna Italy
Abstract
AbstractElectric vehicles (EVs) charging swapping stations (CSSs), as well as multi‐functional integrated charging and swapping facilities (CSFs), have become important to reduce the impact of e‐mobility on the electric power distribution system. This paper presents a coordinated planning optimization strategy for CSSs/CSFs and active distribution networks (AND) that includes distributed generation. The approach is based on the application of a specifically developed spatial‐temporal load forecasting method of both plug‐in EVs (PEVs) and swapping EVs (SEVs). The approach is formulated as a mathematical programming optimization model that provides the location and sizing of new CSSs, the best active distribution network topology, the required distributed generation, and substation capacities. The developed model is solved using CPLEX, and its characteristics and performances are evaluated through a realistic case study.
Funder
National Natural Science Foundation of China
Publisher
Institution of Engineering and Technology (IET)
Subject
Electrical and Electronic Engineering,Energy Engineering and Power Technology,Control and Systems Engineering
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献