Shop floor dispatching with variable urgent operations based on Workload Control: An assessment by simulation

Author:

Yuan Mingze123,Ma Lin4,Qu Ting235ORCID,Thürer Matthias6

Affiliation:

1. School of Management Jinan University Guangzhou China

2. Guangdong International Cooperation Base of Science and Technology for GBA Smart Logistics Jinan University Zhuhai P.R. China

3. Institute of Physical Internet Jinan University Zhuhai China

4. Department of Industrial and Systems Engineering The Hong Kong Polytechnic University Hong Kong China

5. School of Intelligent Systems Science and Engineering Jinan University Zhuhai China

6. Chair of Factory Planning and Intralogistic Chemnitz University of Technology Chemnitz Germany

Abstract

AbstractMeeting customer time requirements poses a major challenge in the context of high‐variety make‐to‐order companies. Companies need to reduce the lead time and process urgent jobs in time, while realising high delivery reliability. The key decision stages within Workload Control (WLC) are order release and shop floor dispatching. To the best of our knowledge, recent research has mainly focused on order release stage and inadvertently ignored shop floor dispatching stage. Meanwhile, urgency of job is not only related to its due date, but also affected by the dynamics of shop floor. Specifically, urgency of jobs may decrease at downstream operations in the job's routing, since priority dispatching for urgent jobs accelerates production speed at the upstream operations. And occupying production resources increases the waiting time of non‐urgent jobs at workstation. This phenomenon leads to the change of urgency of jobs. Misjudgement of urgent jobs therefore may result in actual urgent jobs not being processed in time. In response, the authors focus on shop floor dispatching stage and consider the transient status of urgent operations in the context of WLC. The urgency of jobs is rejudged at the input buffer of each workstation, which is firstly defined as urgent operations and non‐urgent operations. Using simulation, the results show that considering the transient status of urgent operations contributes to speeding up production for actual urgent jobs and meeting delivery performance both in General Flow Shop and Pure Job Shop. In addition, percentage tardy performance is greatly affected by norm levels, especially at the severe urgent level. These have important implications on how urgent operations should be designed and how norm level should be set at shop floor dispatching stage.

Funder

National Key Research and Development Program of China

Publisher

Institution of Engineering and Technology (IET)

Subject

Artificial Intelligence,Industrial and Manufacturing Engineering,Computer Science Applications,Hardware and Architecture

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3