1. ‘System disturbance on 4 November 2006’, Final report, 2007 Brussels, Belgium
2. ‘European wind turbine testing procedure development’, Technical report, 2001 Roskilde, Denmark
3. ‘Controls Advanced Research Turbine (CART) commissioning and baseline data collection’, Technical report, 2002 Golden, CO
4. Methods for Increasing Region 2 Power Capture on a Variable-Speed Wind Turbine